The BEDNAR production plant has undergone significant modernisation in recent years. A significant milestone was the construction of a new two-storey production hall, which was put into operation in 2020. Since then, there has been a gradual construction of new outdoor and indoor storage areas, streamlining the assembly process, as well as the construction of a new semi-automatic warehouse and associated processing and painting.
A UNIQUE OPPORTUNITY TO SEE THE ENTIRE PRODUCTION PROCESS
As part of excursions for high school and university students, we have prepared a short presentation about the history and formation of BEDNAR, along with an overview of interesting facts from various markets. During the tour of the production plant itself, visitors had the opportunity to see the entire production process – from painting, through pre-assembly, to final assembly of individual machines. The final stop and presentation of individual products in the outdoor display area are always immensely popular; visitors can see machines in different specifications and configurations.
A large group of students from Lycée Saint François d’Assise la Roche sur Yon in France
4th and 5th-year students of the operations engineering at Mendel University in Brno